Home>DCS>Emerson IC695ACC402-AA PACSystems RX3i CPE330 Energy Pack

Hot Categories

Emerson IC695ACC402-AA PACSystems RX3i CPE330 Energy Pack

Emerson IC695ACC402-AA PACSystems RX3i CPE330 Energy Pack

Item NO.: 3811748

Warranty: 1 year 


Condition : brand new in factory sealed box


Email: sales@mvme.cn


Chat online: +86 18030175807

Detail

  • Product NameEmerson IC695ACC402-AA PACSystems RX3i CPE330 Energy Pack
  • Item NO.3811748
  • Weight1.0000 kg = 2.2046 lb = 35.2740 oz
  • CategoryDCS
  • BrandEmerson
  • Creation Time2026-10-28
CPE330 ENERGY PACK · INITIAL AA HARDWARE EXECUTION

Emerson IC695ACC402-AA PACSystems RX3i CPE330 Energy Pack

An RX3i Energy Pack for preserving CPE330 user memory during an input-power interruption.

MANUFACTUREREmerson
EXACT MODELIC695ACC402-AA
PRODUCT FAMILYPACSystems RX3i
01

Technical Summary

PRODUCT CONTEXT

IC695ACC402-AA is the PACSystems RX3i Energy Pack used with the CPE330 controller. During a power interruption it maintains controller power long enough for the CPU to write user memory to nonvolatile storage.

The AA execution is the initial production hardware release. Its service boundary includes the Energy Pack base, replaceable Cap Pack, connecting cable and grounding arrangement rather than the base catalog number alone.

02

Specifications

CONTROLLED DATA
Controller application

CPE330

Hardware revision

AA

Initial Energy Pack firmware

2.19

Connection cable

IC695CBL002 in the documented CPE330 arrangement

Primary role

Supports transfer of user memory to nonvolatile storage during power loss

03

Features

FUNCTIONAL DISTINCTIONS
01

Controlled power hold-up

Stored energy gives the CPE330 the time required to complete its shutdown memory-save sequence.

02

Serviceable energy element

The Cap Pack is a defined part of the Energy Pack assembly and should be handled as a separate lifecycle item.

03

Status-aware maintenance

Energy Pack condition and controller status should be checked together rather than treating the pack as a passive accessory.

IndustryParts industrial parts support
INDUSTRIAL SPARE-PART SUPPORT

About IndustryParts

https://www.industryparts.com/

Controlled handling for IC695ACC402-AA

IndustryParts keeps the submitted IC695ACC402-AA identity, requested quantity and installed-system evidence together so a proposed supply can be checked before dispatch.

  • Complete submitted model retained
  • Installed-system evidence reviewed
  • Quotation record kept with the enquiry
04

Compatibility

SELECTION BOUNDARIES
A

CPU boundary

Use IC695ACC402-AA with the CPE330 arrangement identified for this Energy Pack; do not assume compatibility with another RX3i CPU family.

B

Cable and grounding

Confirm the IC695CBL002 connection, ground strap and physical mounting before applying controller power.

C

Revision control

Keep the AA hardware and its firmware record visible when evaluating a replacement Energy Pack or Cap Pack.

05

Replacement

SERVICE WORKFLOW
01

Prepare

Back up the controller project and record CPU, Energy Pack, Cap Pack and cable identities plus the present status indications.

02

Replace

Follow the approved discharge and isolation procedure, connect the exact cable and ground, and avoid disturbing adjacent controller wiring.

03

Confirm

Restore power, verify Energy Pack readiness and perform the approved power-loss memory-retention test before production release.

06

FAQ

CUSTOMER DECISION SUPPORT
Q01

Is IC695ACC402-AA a general RX3i backup battery?

No. It is an Energy Pack for the CPE330 shutdown-memory process and must be handled with its specified CPU, Cap Pack and cable arrangement.

Q02

Why does the AA revision matter on IC695ACC402-AA?

AA identifies the initial production hardware execution and belongs with the firmware and service history used to evaluate a spare.

Q03

What should accompany a IC695ACC402-AA quotation?

Provide the CPE330 catalog and firmware, Energy Pack and Cap Pack labels, cable identity, status indication and requested quantity.

Q04

Can the Cap Pack be evaluated separately from IC695ACC402-AA?

It can be serviced as a defined component, but the final readiness check must cover the complete Energy Pack and controller shutdown path.

Q05

What proves IC695ACC402-AA is ready after service?

A stable ready indication plus a controlled power-loss test that confirms the CPE330 completes its nonvolatile memory save.

You May Also Like