Home>PLC>Schneider Electric Triconex TCM4355X Communication Module

Hot Categories

Schneider Electric Triconex TCM4355X Communication Module

Schneider Electric Triconex TCM4355X Communication Module

Item NO.: 3790387

Warranty: 1 year 


Condition : brand new in factory sealed box


Email: sales@mvme.cn


Chat online: +86 18030175807

Detail

  • Product NameSchneider Electric Triconex TCM4355X Communication Module
  • Item NO.3790387
  • Weight1.2800 kg = 2.8219 lb = 45.1507 oz
  • CategoryPLC
  • BrandSchneider
  • Creation Time2026-10-13
Triconex / Safety communications / TCM

Schneider Electric Triconex TCM4355X Communication Module

A Tricon communication module whose hardware identity, firmware build and certified controller configuration must be managed together.

ManufacturerSchneider Electric Triconex
Exact modelTCM4355X
Product typeTricon Communication Module
01

Product Identification

TCM4355X identifies a Triconex Tricon Communication Module used in the communication architecture of a Tricon safety controller. The module is configuration-sensitive and must be matched to the approved controller release and TriStation project.

Independent ISASecure certification records identify TCM 4355X within a certified Tricon communication-module scope. Schneider Electric documentation for exact technical details is access-controlled, so unsupported port counts or protocol claims are intentionally omitted.

02

Engineering Data

Manufacturer Schneider Electric Triconex
Exact Model TCM4355X
Product Type Tricon Communication Module
Controller Family Tricon safety system
Engineering Environment TriStation 1131 project configuration
Configuration Control Record hardware, firmware and communication setup
Certification Context Included in an ISASecure-certified Tricon communication-module scope
Replacement Rule Use the approved Tricon maintenance and module-replacement procedure
Selection Basis Exact module label and controller compatibility record
03

Functions

01

Provides configured external communications for the Tricon controller architecture.

02

Exchanges data only through the protocols and ports enabled in the approved project and firmware.

03

Reports module and link diagnostics to the Tricon maintenance environment.

04

Supports lifecycle maintenance when hardware and firmware baselines remain controlled.

04

Applications

  • Safety instrumented systems where the approved Tricon architecture specifies TCM4355X.
  • Communication replacement during a planned maintenance window with configuration and firmware evidence available.
  • Controller-network upgrades that retain validated safety boundaries and cybersecurity controls.
  • Spare verification requiring the exact TCM4355X label rather than a generic TCM description.
05

Lifecycle

  • Export or print the TriStation hardware and communication configuration before removal.
  • Record module firmware, chassis position, cable destinations, network addresses and partner systems.
  • Follow Schneider Electric procedures for online replacement only when the controller state and project permit it.
  • After installation, verify diagnostics, every configured link, data quality, time behavior and the safety-system management-of-change record.
IndustryParts technical customer support

About IndustryParts

https://www.industryparts.com/

Safety communication configuration travels with the module

IndustryParts records TCM4355X with its Tricon communication role, firmware build and approved project configuration.

  • Exact module retained
  • Firmware captured
  • Network plan archived
07

FAQ

What information is required to quote TCM4355X?

Provide the complete module label, Tricon system release, TriStation version, firmware, chassis position and configured network interfaces.

Can another Tricon TCM replace TCM4355X?

Not from the shared family name alone; hardware support, firmware, project configuration and certified system scope must be checked.

Why are generic protocol lists omitted for TCM4355X?

The exact enabled interfaces depend on controlled Schneider Electric documentation and project configuration; guessing them could create an unsafe integration decision.

How should communications be tested after fitting TCM4355X?

Test every configured peer, data direction, update behavior, diagnostics and failure response under the approved site validation plan.

What cybersecurity evidence should accompany TCM4355X maintenance?

Retain firmware provenance, approved network diagram, access settings, change authorization and results from the post-maintenance communication test.

Enquiry Information

Send the complete TCM4355X label, requested quantity and destination for an exact enquiry record.

WHATSAPP / PHONE+86 18030175807

You May Also Like