Home>DCS>Yokogawa ANB10D/421/NDEL Dual-Redundant ESB Bus Node Unit

Hot Categories

Yokogawa ANB10D/421/NDEL Dual-Redundant ESB Bus Node Unit

Yokogawa ANB10D/421/NDEL Dual-Redundant ESB Bus Node Unit

Item NO.: 3792996

Warranty: 1 year 


Condition : brand new in factory sealed box


Email: sales@mvme.cn


Chat online: +86 18030175807

Detail

  • Product NameYokogawa ANB10D/421/NDEL Dual-Redundant ESB Bus Node Unit
  • Item NO.3792996
  • Weight10.0000 kg = 22.0462 lb = 352.7396 oz
  • CategoryDCS
  • BrandYOKOGAWA
  • Creation Time2026-10-14
CENTUM FIO | DUAL-REDUNDANT ESB BUS | NODE EXPANSION OPTION

Yokogawa ANB10D/421/NDEL Dual-Redundant ESB Bus Node Unit

A submitted ANB10D node-unit configuration carrying the NDEL node-expansion software option.

ManufacturerYokogawa
Exact modelANB10D/421/NDEL
Product typeCENTUM ESB Bus Node Unit Configuration
01

Key Information

ANB10D/421/NDEL identifies a Yokogawa ANB10D dual-redundant ESB Bus Node Unit configuration. The node communicates field analog and contact I/O with a Field Control Unit through the ESB bus and supplies power to its I/O modules.

The submitted separator and 421 suffix are retained exactly on this draft. Current Yokogawa ordering tables use a structured ANB10D suffix format, so the installed nameplate should be checked before publication or purchase.

02

Functions

01

Connects field I/O modules to the CENTUM Field Control Unit through a dual-redundant ESB bus interface.

02

Provides redundant power-supply and bus-interface positions within the ANB10D node architecture.

03

Supports as many as eight I/O module positions in the documented node-unit configuration.

04

Carries the NDEL node-expansion software option for specified CENTUM Field Control Unit connections.

03

Specifications

Manufacturer Yokogawa
Submitted model string ANB10D/421/NDEL
Base model ANB10D
Product type Node Unit for Dual-Redundant ESB Bus
System family CENTUM FIO
I/O module capacity Up to 8 modules
Bus interface Dual-redundant ESB Bus Interface Slave Module positions
Power arrangement Dual power-supply module positions
Mounting 19-inch rack; four M5 mounting screws
Expansion option NDEL software license for node expansion
Ordering check Verify complete nameplate separators and suffix characters
04

Installation

  • Confirm the complete ANB10D nameplate, power modules, bus-interface modules and FCU model before shutdown.
  • Document redundant ESB cables, node address, power feeds, grounding and every installed I/O module position.
  • Maintain the required ventilation path and keep signal cables clear of the cable-tray ventilation openings.
  • Verify the node-expansion license and controller database capacity before connecting the node to the FCU.
05

Lifecycle

  • Retain the node database, slot map and redundant bus topology with the asset record.
  • Keep power-module and SB401 interface-module identities with the node rather than recording only the rack code.
  • Resolve the submitted 421 suffix against the physical nameplate before final order approval.

About IndustryParts

https://www.industryparts.com/

Node configuration is reviewed as a complete CENTUM assembly

IndustryParts keeps ANB10D/421/NDEL tied to its node label, redundant ESB path, power modules and controller database.

  • Submitted identity retained
  • Bus topology documented
  • Nameplate verification required
IndustryParts warehouse picking
07

FAQ

Q01

Why must the nameplate be checked for ANB10D/421/NDEL?

The current Yokogawa catalog uses a structured ANB10D suffix code, so separator and character verification prevents an incorrect power or environmental execution.

Q02

What controller information is needed for an ANB10D/421/NDEL enquiry?

Provide the FCU model, CENTUM release, node-expansion package, connected-node count and dual ESB topology.

Q03

What rack records should accompany ANB10D/421/NDEL?

Send the slot map, both power-module labels, both SB401 labels, installed I/O modules, node address and cabinet position.

Q04

Can ANB10D/421/NDEL be added without checking database capacity?

No. The FCU database and node-expansion license determine the supported node count and must be reviewed before integration.

Q05

What should be validated after ANB10D/421/NDEL service?

Check both power paths, both ESB paths, node recognition, every installed I/O module and representative field signals before return to operation.

Enquiry Information

Send the complete ANB10D/421/NDEL label, quantity and destination for an exact enquiry record.

WHATSAPP / PHONE+86 18030175807

You May Also Like